top of page

CONSULTANCY

Find below some recent projects that I have been involved in.

 

  • Project: Multi-criteria optimisation approach for solving a integrated transportation and inventory problem (2011-2012). This project, conducted with Eli A. Vitor Toso from Department of Production Engineering at UFSCar, supported a decision of freight distribution regarding full truck load (FTL) and less than truck load (LTL) in the telecommunication enterprise.

       Company: SKY

 

  • Project: Collaboration in retail supply chain (2012). This project, conducted by Hugo Yoshizaki, supported the relationship between the largest Brazilian retailer and its suppliers.

       Company: Compania Brasielira de Dsitribuição (CBD)

 

  • Project: Collaboration in health care industry (2012). This project, conducted by Hugo Yoshizaki, supported the relationship between the largest hospital in Brazil and its pharmaceutical suppliers.

       Company: Hospital Albert Einstein

 

bottom of page